Horsley went up through the estate boom, so most kitchens here are not old, they are just worn out. The houses came with kitchens built to a price, in open plan rooms that are otherwise perfectly good, and fifteen or twenty years later the parts that were never meant to last that long have reached the end.
So the job is rarely about changing the layout. These homes were planned as open plan from the start, the island is generally in a sensible spot, and the plumbing and power are where they should be. What has gone is the hardware, which fails quietly, and the carcasses, which fail under the sink and along the toe kick where water gets in. Benchtops are third, usually showing it at the joins and around the sink cutout. Replacing all of that in the same footprint is the most cost effective kitchen job there is, because none of the money goes into moving services.
Marcio is Wollongong based and Horsley is a straight run west past Dapto. Carpentry and cabinetry, benchtop fabrication and tiling for the splashback are our own work, with plumbing and electrical through licensed partners if anything moves, which on a straight replacement is often very little.
Where the plan already works, the money goes into carcasses, hardware, benchtop and finish rather than into moving services. It is the most cost effective kitchen job there is, and it is why an estate kitchen can be brought up to a high standard for less than people expect, with a shorter trade list and a more reliable finish date.
Runners and hinges are what you touch every day and what fails first in a builder's kitchen. Spending here is the difference you notice for the next fifteen years, and as a share of the total it is small enough that skimping on it a second time makes very little sense once you have lived with the first version.
Where the carcasses are sound this is a real option and a lot cheaper than a full rebuild. We check under the sink and along the toe kick before recommending a full replacement, because that is where the answer is and it takes two minutes to look. If the boxes have swollen, refacing them is money on something already finished.
Most of these homes already have one. Making it work usually means storage on both sides, a bench depth that suits how it is used, and power where people actually need it. An island that is only a bench is a lot of floor space doing one job, and that is worth rethinking while the kitchen is out.
An estate kitchen replaced in the same footprint, with better carcasses, hardware and benchtop.
The hardware goes first, and it goes quietly. Drawer runners that sag, hinges that stop holding a door level, soft close that stopped closing softly years ago. None of it stops the kitchen working, it just makes using it slightly annoying every single day until you stop noticing. It is also a relatively small part of the total, which is why skimping on it a second time makes very little sense once you have lived with the first version.
Then the carcasses. Standard builder cabinetry is usually a particle board carcass with a thin finish, and the places it fails are predictable: under the sink where water gets in, and along the toe kick where the mop goes. Once a carcass has swollen it cannot be repaired, only replaced, and refacing it is money spent on something that is already finished. That is the test we run before recommending anything, and it takes two minutes to look.
Benchtops are third. A laminate top in a family kitchen takes a beating and shows it at the joins and around the sink cutout, which is also where water starts getting into the board underneath and where the swelling usually begins. It is the part people want to spend on first because it is the visible one, and it matters, but a beautiful benchtop on failing boxes is money in the wrong order and we will say so.
What is usually fine is the layout and the services, and that is the good news. It means the money goes into the things you touch rather than into moving pipes, and a straight replacement in the same footprint is also the job most likely to finish on the week it was promised, because the trade list is short and nothing depends on what is found behind a wall. Where the carcasses are still sound, doors and benchtop alone is a real option and considerably cheaper, and we will tell you which camp your kitchen is in rather than defaulting to the bigger job.
More on kitchen renovations, bathroom renovations, built in wardrobes and home renovation work.
Into the parts you touch and the parts that hold water.
Hardware comes first. Drawer runners and hinges are used dozens of times a day, and the gap between budget and good is something you feel every time. It is also a relatively small part of the total.
Carcasses come second, specifically what sits under the sink. That is where every builder's kitchen fails, and a better carcass with proper sealing there adds years to the whole kitchen.
Benchtop is third, and it is where people tend to spend first because it is the visible one. It matters, but a beautiful benchtop on failing boxes is money in the wrong order, and it is the order we see most often.
Appliances are a separate budget and they are yours to choose. What we will say is that the cabinetry should be built around the appliances you actually want, which means deciding on them before the cabinetry is made rather than after. Changing an oven size once the cabinetry is built is an expensive way to save money earlier.
Send through a few photos of the room as it is now, and you will get a straight answer on what it involves and what it costs.
Renovation work in NSW comes with consumer protections worth knowing before you sign anything. A written contract is required once the contract price is over $5,000 including GST. Work between $5,000 and $20,000 can run under a small works contract; above $20,000 it needs a full home building contract, and home building compensation cover with the certificate that goes with it. The maximum deposit anyone can ask for is 10 per cent, on a small job or a large one. Variations should be agreed in writing before the varied work happens, not reconciled at the end. None of that is unique to us, and you should expect it from whoever you use.
Every job gets quoted on what it actually needs. We look at the access, the condition of what is already there, the materials you want and how much of the existing work can be kept, then give you a figure before anything starts. Two jobs that look identical in photos can be very different once someone is standing in the room, so we do not publish a rate card. You get a price for your job, and it does not move once we have agreed it.
Horsley is a straight run west past Dapto, with Kembla Grange, Albion Park, Unanderra and Dapto itself all a short drive away. Work out this way gets batched where the timing allows, which keeps travel off the invoice on a job that runs over a few weeks. A first look here is quick, because what matters is the state of the carcasses under the sink and along the toe kick rather than anything structural.
Plumbing and electrical work is carried out by licensed partners, not in-house.
If the hardware and the carcasses have gone, yes, because those are the parts that cannot be repaired. Doors and benchtops can be replaced on sound carcasses, which is a genuinely cheaper option and worth asking about. The test is the carcass under the sink and along the toe kick. If those are swollen, the box is done and refacing it is money spent on something that will fail anyway. We look and give you a straight answer rather than defaulting to a full replacement, because half the time the cheaper job is the right one.
Sometimes, and it is a real option worth pricing. It works when the carcasses are sound and the layout suits you, and it is considerably cheaper than a full rebuild. It does not work where the boxes have swollen, where the hardware is built into the doors in a way that limits what can be fitted, or where you want to change the layout at all. We check the carcasses first and tell you which camp your kitchen is in, and we will price both if it is borderline rather than pushing the bigger job.
Book a time for us to look at the kitchen. The main thing we are checking is whether the carcasses are sound, because that decides whether you are looking at a refit or a full replacement, and the two are very different numbers. If you already know the appliances you want, have the models handy, because they affect the cabinetry. You get an itemised written quote with the exclusions listed. Call 0413 147 335.
Carpentry and cabinetry, benchtop fabrication, tiling for the splashback, plus plumbing and electrical through our licensed partners if anything moves. On a straight replacement in the same footprint the trade list is short, which is part of why it is good value and part of why it runs to time more reliably than a job that moves services or opens a wall. It also means fewer people to coordinate around the week you are without a kitchen.
Horsley jobs we also cover include welding. Close by, there is kitchen renovations in Oak Flats, kitchen renovations in Port Kembla and landscaping in Dapto.
“Finally found someone who actually turned up when he said he would!”
“Cheerful, quick, and didn't try to upsell me on things I didn't need. Rare these days.”
“Turned a weekend-long headache into a one-visit fix. Absolute legend.”