Jamberoo is the valley behind Kiama, rolling dairy country with houses on acreage rather than suburban blocks. The ground is heavy clay over basalt, which is good soil and difficult to dig, and the properties are large enough that most retaining work out here is tied to a driveway, a yard or a shed pad rather than to a back garden.
That changes the brief in three ways. The walls are longer, which makes setting out matter more than it does over five metres. The ground drains poorly and goes very hard when dry, so drainage behind the wall is more important and excavation is slower. And more often than not something has to drive over or park near the top of the wall, which changes the design rather than just the price. Vehicle load near the top of a wall is the single question most quotes never ask about.
Marcio is Wollongong based and the Jamberoo valley is a regular run for us rather than a special trip. Retaining walls, drainage, fencing, farm gates and steel fabrication are all our own work, so a wall with a gate or a fence on top of it gets built as one job and the posts get set while the wall is going in.
Load above a wall changes the design, not just the price. Tell us early if anything drives or parks near the top and it goes in from the start. Adding that requirement to a finished wall usually means building it again, because the footing and the reinforcement are what change rather than the facing. It is the single question most quotes never ask.
Over thirty metres a wandering line is visible from the house for good. We spend the time getting the string line and the levels right before anything goes in, because that is the part you cannot adjust once the first course is down and backfilled. It is the least visible part of the job and the one you would notice most if it were skipped.
Slow to excavate when dry and almost no drainage through it. The drainage behind the wall matters more here, not less. Water that cannot pass through the clay runs along the back of the wall looking for a way out, and over a long wall that means real falls and real outlets rather than one point and good intentions.
Holding the high side of a cut so the driveway stays clear and the batter stops moving down onto it every wet season. On a long driveway that is usually the wall that pays for itself first, because the alternative is clearing the same slip every year and losing the surface underneath it as well.
A block wall holding the high side of a driveway cut, built for the load that goes over the top of it.
The most important question on a rural wall is what goes above it. A wall holding a garden is one thing. A wall holding the edge of a driveway that a loaded ute or a small truck uses is another, and the difference is not a matter of adding a bit extra. Vehicle load near the top of a wall increases the pressure on it substantially, and a wall designed without it will lean or fail. So we ask early. If a driveway, a turning area, trailer parking or stock access is anywhere near the top, that goes into the design from the beginning rather than being accommodated later, because adding it afterwards usually means building it again.
The ground is the second factor. Heavy clay over basalt drains poorly and gets very hard when dry, which makes excavation slower and makes drainage behind the wall more important, not less. Water that cannot get through the clay runs along the back of the wall looking for a way out, and it will find the weakest point. Over a long wall that means real falls and real outlets rather than one drainage point and good intentions.
Length is the third. On a long rural wall, setting out matters. A wall that wanders or steps unevenly over thirty metres looks wrong from the house for the next twenty years, and there is no fixing it afterwards once the first course is down and backfilled. We spend the time on the string line and the levels before anything goes in, which is the least visible part of the job and the one you would notice most if it were skipped.
Material choice follows from all three. Treated timber is the most economical at lower heights and suits a rural setting, but it does not suit vehicle load or constant saturation against the back face, so on a driveway edge in heavy clay it is usually the wrong call. Concrete block is the workhorse for anything tall or carrying load above it. Rock and gabion look right on acreage and drain through, though they need space behind them. Where a wall is tall or carries vehicle load, we will say that it needs engineering input.
More on retaining walls, fencing, landscaping and gates, handrails and balustrades.
All three work out here and the right one depends on height, load and how it has to look.
Treated timber is the most economical at lower heights and it suits a rural setting. What it does not suit is vehicle load or constant saturation against the back face, so on a driveway edge in heavy clay it is usually the wrong choice.
Concrete block is the workhorse for anything tall or carrying load above it. It is more expensive and the footing is more work, and it is what we would recommend where a driveway sits at the top.
Rock walls and gabion look right on acreage and handle water well because they drain through. They need space behind them and they are not the cheapest option, but on a long rural line they often look better than anything manufactured.
What we will not do is quote the cheapest option for a position that does not suit it. If you ask us for timber on a driveway edge we will tell you why we think block is the answer and let you decide with the facts in front of you.
Send through photos of the slope and the height you are trying to hold, and you will get a straight answer on what it involves and what it costs.
Renovation work in NSW comes with consumer protections worth knowing before you sign anything. A written contract is required once the contract price is over $5,000 including GST. Work between $5,000 and $20,000 can run under a small works contract; above $20,000 it needs a full home building contract, and home building compensation cover with the certificate that goes with it. The maximum deposit anyone can ask for is 10 per cent, on a small job or a large one. Variations should be agreed in writing before the varied work happens, not reconciled at the end. None of that is unique to us, and you should expect it from whoever you use.
Every job gets quoted on what it actually needs. We look at the access, the condition of what is already there, the materials you want and how much of the existing work can be kept, then give you a figure before anything starts. Two jobs that look identical in photos can be very different once someone is standing in the room, so we do not publish a rate card. You get a price for your job, and it does not move once we have agreed it.
Jamberoo sits behind Kiama, with Minnamurra, Gerringong and Berry all within a short drive. Work in the southern end of our area gets batched across those where the timing allows, which keeps travel reasonable on a job an hour from the workshop. On acreage a first look means walking the full line of the wall and checking what gets driven over the top of it, because the load above and the access along it decide the design before the material does.
Plumbing and electrical work is carried out by licensed partners, not in-house.
It matters a great deal, and it needs to be in the design from the start. Load from a vehicle near the top of a wall adds significantly to the pressure on it, and a wall built for soil alone will lean or fail under it. Tell us at the first conversation if a driveway, a turning area or trailer parking is anywhere near the top. Adding that requirement afterwards usually means building it again, because the footing and the reinforcement change rather than the facing, so it is worth a minute on the phone.
Yes, and the main things that change on a long wall are setting out and drainage. A line that wanders over thirty metres is obvious from the house forever, so the string line is worth the time. Drainage over that length needs real falls and real outlets rather than one point and good intentions. On heavy clay that is the difference between a wall that lasts and one that does not, and it is most of what separates two quotes that look a long way apart on price.
Photos along the line of the wall, the length, the height you need to hold, and most importantly whether anything drives or parks near the top. On acreage we will almost always come and look, because access and ground conditions decide the price. If there is an existing wall or batter failing, photos of the base of it help more than the face. You get the exclusions listed in writing. Call 0413 147 335.
Yes. Fencing, farm gates, handrails and steel fabrication are all our own work, so a wall with a fence or a gate on top of it gets built as one job. On acreage that saves a second trade travelling out and the two parts line up properly. It also means the gate posts can be set while the wall is going in rather than cored into it later, which is both cheaper and a far better fixing. Concreting for footings is part of the job rather than a separate quote.
“Finally found someone who actually turned up when he said he would!”
“Cheerful, quick, and didn't try to upsell me on things I didn't need. Rare these days.”
“Turned a weekend-long headache into a one-visit fix. Absolute legend.”